Evansville Vanderburgh Public Library

Precipitate dissolution and gettering under vacancy injection in silicon, final subcontract report 21 March 2006 - 15 January 2008, T.Y. Tan and N. Li

Label
Precipitate dissolution and gettering under vacancy injection in silicon, final subcontract report 21 March 2006 - 15 January 2008, T.Y. Tan and N. Li
Language
eng
Abstract
Using a deposited Al layer, optical processing at a temperature below the Si-Al eutectic temperature of Teu=577⁰C for a few minutes and followed by T>Teu for a few more minutes are able to getter metallic precipitates out of multicrystalline Si. To accomplish the same, a few tens of hours are needed when using thermal annealing at 700⁰C. Possible mechanisms involved in optical-processing gettering are proposed: vacancy injection, radiation-enhanced solubility, and radiation-enhanced diffusion of vacancies and metal impurity atoms. Using FeSi2 as a model case for which the Si lattice expands concomitantly with the dissolution of precipitates, physical modeling and numerical simulations uncover and test the conditions for the mechanisms to be effective. The mechanisms are effective if the injected Si vacancies due to alloy formation are nearly all retained inside and evenly distributed throughout the Si bulk at the lower temperature, and if the Fe atom migration energy barrier is reduced by 0̃.15 eV by radiation at the higher temperature. On the other hand, for gettering a precipitate species for which the Si lattice will shrink concomitantly with the dissolution of precipitates, the vacancy-injection mechanism will not only be ineffective but should also have a detrimental effect
resource.governmentPublication
federal national government publication
Illustrations
illustrations
Index
no index present
Literary Form
non fiction
Main title
Precipitate dissolution and gettering under vacancy injection in silicon
Nature of contents
technical reportsdictionaries
Oclc number
259718961
Responsibility statement
T.Y. Tan and N. Li
Series statement
Subcontract report, NREL/SR-520-44088
Sub title
final subcontract report 21 March 2006 - 15 January 2008
Creator
Content
Mapped to

Incoming Resources