Evansville Vanderburgh Public Library

High-R walls for new construction structural performance, integrated rim header testing, prepared by A. DeRenzis, V. Kochkin, and J. Wiehagen, NAHB Research Center ; prepared for The National Renewable Energy Laboratory, On behalf of the U.S. Department of Energy's Building America Program, Office of Energy Efficiency and Renewable Energy

Label
High-R walls for new construction structural performance, integrated rim header testing, prepared by A. DeRenzis, V. Kochkin, and J. Wiehagen, NAHB Research Center ; prepared for The National Renewable Energy Laboratory, On behalf of the U.S. Department of Energy's Building America Program, Office of Energy Efficiency and Renewable Energy
Note
Title from title screen (viewed on June 6, 2013)"January 2013.""NREL Technical Monitor: Stacey Rothgeb.""DOE/GO-102013-3595."--P. [42]"Prepared under Subcontract Number KNDJ-0-40335-00."
Color
multicolored
Dimensions
unknown
Form Of Item
online
resource.govDocClassificationNumber
E 1.177:DOE/GO-102013-3595
resource.gpoItemNumber
0429-A-90 (online)
Physical Description
1 online resource (viii, 33 pages), illustrations.
resource.reportNumber
DOE/GO-102013-3595
Specific Material Designation
remote
System control number
.b21762144