Evansville Vanderburgh Public Library

Production of hydrogen at the forecourt using off-peak electricity, June 2005, J.I. Levine

Label
Production of hydrogen at the forecourt using off-peak electricity, June 2005, J.I. Levine
Note
Title from title screen (viewed Apr. 8, 2008)"February 2007."
Color
multicolored
Form Of Item
online
resource.govDocClassificationNumber
E 9.29:NREL/MP-560-38354
resource.gpoItemNumber
0430-P-18 (online)
Physical Description
iv, 39 pages, digital, PDF file.
Specific Material Designation
remote
System control number
.b43809352
System details
Mode of access: Internet from the NREL web site. Address as of 4/8/08: http://www.nrel.gov/docs/fy07osti/38354.pdf; current access available via PURL
Access location
Carrier category
Media category

Incoming Resources